- Grading and site preparation✓
- Foundation construction✓
- Framing✓
- Installation of windows and doors✓
- Roofing✓
- Siding✓
- Rough Electrical✓
- Rough Plumbing✓
- Rough HVAC✓
- Insulation
- Drywall
- Texturing
- Trim
- Painting
- Finish electrical
- Bathroom and kitchen counters and cabinets
- Finish plumbing
- Carpet and flooring
- Finish HVAC
- Hookup to water main, or well drilling
- Hookup to sewer or installation of a septic system
- Punch list
We also have our final "pre-sheetrock walk-through" on Friday. This is where we verify where all of the outlets are, where all of the fan pre-wires are, and where all of the can lights are going. Since our house is a preplanned home, designed by a builder, there is not a lot of problems typically with this kind of walk-through.
From here on out, I am pretty sure we will have slower updates. From what I am told, we are getting into the portion of the home build that takes more time. Cabinets, flooring, trim, etc. But, it is also the pretty stuff! So excited for what is to come!