Friday, August 30, 2013

Drywall. Check!

Our drywall and nail inspection are complete! Woohoo! Besides Berto and Luke almost dying on the stairs that came unattached for purposes of finishing the drywall, we made it thus far!

Our final walk through date has been set to October 14th and our closing date is officially....

October 18, 2013!!!


We are SO excited! Some things that are coming in the next week:
  • Tape and spackle
  • Texturing
  • Front steps & driveway
  • Finish roof under front porch
  • Paint exterior











We also had a confirmation e-mail to confirm our stone that goes around our fireplace. I cannot even begin to describe how much I love this stone, and having a fireplace in our family room! Can you picture a Christmas tree in front of the left window, a decorated mantel, I know I can! 


  • Grading and site preparation 
  • Foundation construction
  • Framing 
  • Installation of windows and doors
  • Roofing
  • Siding
  • Rough Electrical
  • Rough Plumbing
  • Rough HVAC
  • Insulation
  • Drywall
  • Texturing
  • Trim
  • Painting 
  • Finish electrical
  • Bathroom and kitchen counters and cabinets (The cabinets have been ordered!!)
  • Finish plumbing
  • Carpet and flooring
  • Finish HVAC
  • Hookup to water main, or well drilling
  • Hookup to sewer or installation of a septic system
  • Final walk - through (October 14, 2013)




  • We also see this truck often cruising through our neighborhood so we tracked them down and had some BOMB tacos! We left the kids in the car running, stood outside the car and ate off of our truck. It was pure bliss - best date we have had in a long time ;) 