After not visiting our home since Monday, we have realized how slow these next couple weeks are going to be. We think it is because they gave us a time frame. Now we know where we stand so it is going to take that much longer!



  • Grading and site preparation
  • Foundation construction
  • Framing 
  • Installation of windows and doors
  • Roofing
  • Siding
  • Rough Electrical
  • Rough Plumbing
  • Rough HVAC
  • Insulation
  • Drywall (currently waiting on delivery)
  • Texturing
  • Trim
  • Painting
  • Finish electrical
  • Bathroom and kitchen counters and cabinets (The cabinets have been ordered!!)
  • Finish plumbing
  • Carpet and flooring
  • Finish HVAC
  • Hookup to water main, or well drilling
  • Hookup to sewer or installation of a septic system
  • Final walk - through










In the next week we should expect to see the driveway, steps to the front porch, drywall, and nail inspection finished. Heres to hoping that the weather is dry so the drywall can be delivered. 