We are getting closer and closer by the day. From Monday they only have three weeks to be finished because that is when our first walk through happens! Notice the driveway and steps have been poured! Finally, rain, you lose!
Here are a few more things we can check of our list:
Grading and site preparation ✓
Foundation construction
Framing
Installation of windows and doors
Roofing
Siding
Rough Electrical
Rough Plumbing
Rough HVAC
Insulation
Drywall
Texturing
Trim
Tile
Painting
Finish electrical
Bathroom and kitchen cabinets
Counter installation (ordered)
Finish plumbing
Wood floor installation
Carpet installation
Finish HVAC
Hookup to water main, or well drilling
Hookup to sewer or installation of a septic system
Final walk - through (October 14, 2013)
Our railing is still wrapped from the painting, but I peeled back the top part so we could see the stain color! LOVE IT!
Ceiling/wall contrast. This actually is a little shadow-y, because the color is not that dark.
See these blue skies, this is normal for Colorado. No Photoshop or filter on this photo, the skies were literally this blue today.
In the next week we are hoping for tile, wood floors, and maybe even counters!