- Grading and site preparation✓
- Foundation construction✓
- Framing✓
- Installation of windows and doors✓
- Roofing
- Siding (in progress)
- Rough Electrical
- Rough Plumbing✓
- Rough HVAC✓
- Insulation
- Drywall
- Underlayment
- Trim
- Painting
- Finish electrical
- Bathroom and kitchen counters and cabinets
- Finish plumbing
- Carpet and flooring
- Finish HVAC
- Hookup to water main, or well drilling
- Hookup to sewer or installation of a septic system
- Punch list
That last picture... well, that is what I get for snooping around other houses being built, our future neighbors. I stepped right into a massive mud pile and sunk about 4 good inches. And being the wonderful mother that I am, I led my three year old son into this mess. He loved it though. Me, I lost a flip flop, stepped on something sharp, and used about 40 baby wipes trying to get it off. I think I deserve a trip to the mall to get some new Sanuk's tomorrow! (Best. flip. flop. ever.)
No comments:
Post a Comment